Bridge Rehabilitation

An aging village bridge required new sidewalks and rail in addition to other structural repairs.

Highlander was retained to design the new bridge rail, rail attachment to the bridge, and sidewalks in conformance with the Vermont Agency of Transportation (VTrans) design standards.

During the course of the re-construction it was discovered that a portion of the bridge deck needed to be replaced. The design was modified to integrate the Prior to Rehabilitation partial deck replacement.

aging village bridge
Prior to Rehabilitation
new bridge rail, rail attachment to the bridge
Completed Project